Production area

Production area

603398 Nizhniy Novgorod,
Yablonevaia street, h. 25.
Tel/Fax: +7 (831) 434-88-48,
434-90-33, +7-920-021-7000,
+7-920-292-9999, +7-920-292-4444
E-mail: parebrik@mail.ru

The Vlakos-NN Parebrik Company suggests you to organize a production floor space of a mini-plant. It will help you to start a small-scale business quickly and effectively: to place the equipment for business, to use the floor space rationally, to make products from concrete using plastic molds, such as pavement bricks, fences from concrete and frontal (façade) stones. The size of the floor space depends on the amount of production you are going to manufacture per one shift. 


Organization of the floor spaces of mini-plants

For example: For organization of manufacture of 50 sq. m. per one shift, with placing of one vibration table, one concrete mixer, racks and warehousing of raw components and finished products from concrete, it is necessary to have a floor space from 100 sq. m. Such area of the mini-plant will allow you to use all the equipment for manufacture of products from concrete and to store necessary materials for manufacture of concrete products. We will tell you in detail how to subdivide the area of your mini-plant:

 


 

Organization of the areas for manufacture of products from concrete


The first 50 sq. m. is a working zone, placing of racks, one vibration table, one concrete mixer and other equipment for manufacture of products from concrete.

 


Organization of the areas for raw components and molds for concrete


And the second 50 sq. m. is warehousing of raw components, warehousing of molds for concrete and subsidiary premises


Finished goods warehousing takes place in the street.


Observing this division of the floor space of a mini-plant, you will manufacture up to 50 sq. m. of finished products from concrete, such, as pavement bricks, frontal (façade) stones and fences from concrete, as well as other products from concrete and heavy-duty concrete. It is the best way to start a profitable business.

Requirements to floor spaces:

Presence of three phase feeding: it is necessary. A three-phase feeding is necessary for the work of the equipment for manufacture of the products from concrete.


Temperature indoors: minimum +10 degrees Celsius. A lower temperature won’t allow the products from concrete to harden, or will make them very fragile. 

 


Supply of cold water: it is necessary. Water is one of the components necessary for manufacture of production from concrete.


Supply of hot water: it is recommended.


Presence of a ventilation system: it is recommended. A good air circulation should always be at a production floor space. 

 